Best Choice Products Wicker Egg Chair, Oversized Indoor Outdoor Lounger by BestChoiceProducts

Best Choice Products Wicker Egg Chair, Oversized Indoor Outdoor Lounger

$494.98
Skip to product information
Best Choice Products Wicker Egg Chair, Oversized Indoor Outdoor Lounger by BestChoiceProducts

Best Choice Products Wicker Egg Chair, Oversized Indoor Outdoor Lounger

$494.98

Product Overview

For everyday studio apartments, the Best Choice Products Wicker Egg Chair, Oversized Indoor Outdoor Lounger for Patio, Backyard, Living Room w/ 4 Cushions, Steel Frame, 440lb Capacity - Gray/White Sand balances water-resistant build with home aesthetics. Engineered using Alloy Steel, Wicker, measuring 24"D x 40"W x 56"H, available in Gray/White Sand. Notable features include distinct open-weave and open-weave pattern, contributing to its durable character.

Key Features

  • A distinct, open-weave pattern adds a bohemian touch and complements the decor of your living room, bedroom, or sunroom
  • Water- and UV-resistant wicker with weather-resistant cushions make this seat a natural addition to your patio, garden, poolside, and more
  • Enjoy this seat for years thanks to durable, water-resistant wicker, tightly woven over a powder-coated steel frame
  • Four removable cushions are packed with extra thick padding while the offset, four-legged design with adjustable foot pads supports weights up to 440 pounds!
  • An extra-wide opening gives ample overhead expanse for taller people, while a large seat lets you curl up in comfort with your favorite books or media devices; OVERALL DIMENSIONS: 24"(L) x 40"(W) x 56"(H); WEIGHT CAPACITY: 440lbs.

Why Choose the Best Choice Products Wicker Egg Chair

The Best Choice Products Wicker Egg Chair, Oversized Indoor Outdoor Lounger for Patio, Backyard, Living Room w/ 4 Cushions, Steel Frame, 440lb Capacity - Gray/White Sand matters in lounge chairs because it pairs multi-functional build with distinct open-weave, producing real modern style.

Best For

For users centered on living rooms, the Best Choice Products Wicker Egg Chair, Oversized Indoor Outdoor Lounger for Patio, Backyard, Living Room w/ 4 Cushions, Steel Frame, 440lb Capacity - Gray/White Sand delivers everyday usability through minimalist construction.

Quick Summary

The Best Choice Products Wicker Egg Chair is a Lounge Chairs product by BestChoiceProducts. Brand: Best Choice Products. Color: Gray/White Sand. Material: Alloy Steel, Wicker. Product Dimensions: 24"D x 40"W x 56"H. Size: Set of 1. Price: $494.98.

Product Specifications

Specification Details
Brand Best Choice Products
Color Gray/White Sand
Material Alloy Steel, Wicker
Product Dimensions 24"D x 40"W x 56"H
Size Set of 1

You may also like